OBIAFU 43 WHP - HIPPS INSTALLATION
The Client
Nigeria Agip Oil Company
The Project
Obiafu 43 WHP – High Integrity Pressure Protection System (HIPPS) Installation
Year: 2022
Scope
Engineering, Procurement, Construction, Installation and Commissioning of 15,000 PSI HIPPS on Obiafu 43 Well Head Platform. This involve:
- Detailed Engineering Design of HIPPS Structural platform & Appurtenances, Interconnecting Piping and Instrumentation Design.
- Fabrication Works - Structural and Piping , HIPPS Assembly on Skid.
- Installation & Pre Comm & Commissioning Works - Civil works, Instrumentation installation works.
OEM
PRESSURE & METERING SKID
Mechanical Installation Pre-Commissioning and Commissioning of 5MM SCF Pressure Reduction and Metering Skid.
OBIAFU 44 WHP – HIPPS
Engineering, Procurement, Construction, Installation and Commissioning of 15,000 PSI HIPPS on Obiafu 44 Well Head Platform.
FLARE GAS TO HPC
EPC of Flare to HPC; Conduct Feasibility Study; Conceptual Engineering Design and Detailed Engineering Design, Procurement, Construction and Commissioning.
MANPOWER SUPPLY
Supply of Technical resources to ensure seamless operation of Facility and all installed equipment.
PIPELINE INSTALLATION
Construction/Installation of Gas offtake Spur line from ELPS Tie-in to Olorunsogo Power Plant Pressure Reduction and Metering Station
OBIAFU 43 WHP – HIPPS
Engineering, Procurement, Construction, Installation and Commissioning of 15,000 PSI HIPPS on Obiafu 43 Well Head Platform.
OBIAFU 42 WHP – HIPPS
Engineering, Procurement, Construction, Installation and Commissioning of 10,000 PSI HIPPS on Obiafu 43 Well Head Platform.